zinc coated hot galvanized pipe galvanized steel pipe manufacturers
A519 Seamless Steel Pipe Tube
Chemical Composition:
Standard
|
Steel Grade
|
C(%) |
Si(%) |
Mn(%) |
S(%) |
P(%) |
A519 |
1010 |
0.05-0.15 |
0.15-0.35 |
0.3-0.6 |
≤0.050 |
≤0.040 |
1020 |
0.15-0.25 |
0.15-0.35 |
0.3-0.6 |
≤0.050 |
≤0.040 |
|
1045 |
0.43-0.50 |
0.15-0.35 |
0.6-0.9 |
≤0.050 |
≤0.040 |
|
4130 |
0.28-0.33 |
0.15-0.35 |
0.4-0.6 |
≤0.040 |
≤0.040 |
|
4135 |
0.32-0.39 |
0.15-0.35 |
0.6-0.9 |
≤0.040 |
≤0.040 |
|
4140 |
0.38-0.42 |
0.15-0.35 |
0.7-1.0 |
≤0.040 |
≤0.040 |
Other Specification:
End Shape |
Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements |
|
Surface Treatment |
Oiled, Galvanized, Phosphate etc |
|
Technique |
Cold drawn & cold rolled |
|
Application |
1. Automotive and mechanical pipes |
|
2. Petroleum cracking pipes | ||
3. High Pressure Boiler Pipe | ||
4. Low and middle pressure fluid transportation pipeline | ||
5. Chemical fertilizer equipment pipes | ||
6. Heat exchanger pipes | ||
Delivery Conditions |
1. BK (+C) |
No heat treatment after last cold forming process. |
2. BKW (+LC) |
After last heat treatment there is a light finishing pass (cold drawing) |
|
3. BKS (+SR) |
After the final cold forming process the tubes are stress relieve annealed. |
|
4. GBK (+A) |
After the final cold forming process the tubes are annealed in a controlled atmosphere. |
|
5. NBK (+N) |
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. |
|
Package |
1. Bundle Packing. |
|
2. Plain end or vanished as per customer's request. | ||
3. Wrapped in waterproof paper. | ||
4. Sackcloth with several steel strips. | ||
5. Pack in heavy tri-wall boxes. |
ee japanese tube you jizz tube free japanese tube you jizz tube free japanese tube you jizz tube free japanese tube you jizz
Application
Our Seamless Steel Pipe are capable of making all of the following products :
Fuel injection Pipe, Oil flow pipeline |
Automobile and motorcycle Shock Absorber Pipe |
Seat lifter Pipe | Hydrau-cylinder Pipe |
Bicycle frame steel pipes | Mechanical steel pipes for auto and motor parts |
Auto and Motorcycle Parts | Exhaust Pipe for Generator |
High Heels Steel Pipes | Campanula Seamless Steel Pipe |
Bike and Bicycle Frame | Hydraulic System(Oil Pipeline, Motor Engine Pipe) |
Sewing machine and textile machine parts | Air conditioning fitting |
Gas oil burner pipe | Oil pipe drilling |
Auto and motor pipe fittings | Gas Spring pipe,motor casing pipe |
Product Description
jizz tube free ja
steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe s
steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe s
Equipment
EQUIPMENT PRODUCTION: | EUIPMENT TESTING: | |
| ||
1.Cold Drawn Machine; | 1.Chemical Analysis Instrument; | |
2.High Pressure Washing Platform; | 2.Optical Spectrum Analyze; | |
3.Anaerobic Annealing Furance; | 3.Eddy Current Detector; | |
4.Straightening Machine; | 4.Mechanical Tester; | |
5.Polishing Machine. | 5.Rockwell Harden Tester. |
Qualification
1.We adopt special techniques and special skills in the acid cleaning process to deal with the place where it is easy to form fold crevice;
2.Well organized process,especially annealing treatment in a severely technical manner;
3.In respect with lubrication, we adopt the international advanced level treating process in the world, and put the surface quality of our products under strict control in order to prevent causing surface crack.
steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes
Packaging & Shipping
1.Anti-rust oil coating(free) 2.Capping(charge)
3.Used steel stip to fix(free) 4.Packed with waterproof papper(free)
5.Packed with firm sack cloth(free) 6.Wooden case package(charge)
Company Information
steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes
steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe steel pipes steel pipe s
FAQ
1 | |
Are you a trading company or manufacturer? | |
Yea, we are manufacturer. We have our own manufacturer-Changzhou Chengqi Steel Pipe Factory. | |
Changzhou Drake International Trade Co.,Ltd. is our own export trade platform. | |
URL: www.cqsteelpipe.com/ | |
http://chengqisteelpipe.en.zinc coated hot galvanized pipe galvanized steel pipe manufacturers.com/ | |
2 | |
How can I get the price? | |
We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter, | |
wall thickness length, quantity and application of the steel pipe which you need. If you are very | |
urgent to get the price, please inform us in email so that we will regard your inquiry priority. | |
3 | |
How can I get a sample to check your quality? | |
After price confirmation, you can require for samples to check our quality. | |
we will provide you the sample for free, however we could only make sure the same material, the | |
dimension will be much similar as your request but not same. And customer should afford the | |
charge of shipment. | |
4 | |
How long can I expect to get the sample? | |
The samples will be sent to you via express and arrive in 3-5 days. | |
You can use your own consignee account or prepay us if you do not have an account. | |
5 | |
What about the lead time for mass production? | |
Honestly, it depends on the order quantity and the season you place the order. | |
6 | |
What is the Small Qty Process Charge. | |
It is the payment for customer whose order qty is less then Min Order Qty. Because small qty of | |
products should be processed same in the production flow as big qty and the average cost would | |
get much higher than big ones. So there is a small Qty Process Charge to ensure the profit of our | |
factory and usually the amount of it is about $250.00 | |
7 | |
Could the pipe be customized for us? | |
Yes. We are the professional manufacturer which has rich experience in Precision Seamless Steel | |
Pipe manufacturing. | |
We could print the logo and label under your requirements if you need OEM products. Beside this, | |
we still do some refined processes like CNC cutting, chamfering, galvanization and tapping, if you | |
have detailed spec or drawing.Our production lead time is within 30-45 days. | |
8 | |
What is your terms of delivery? | |
We accept EXW, FOB, CIF, DDU etc. You can choose the one which is the most convenient or cost | |
effective for you. | |
9 | |
Shipping | |
European Countries: 22-28 days, | |
The United States: East --13-16 days, West--21-28 days | |
Brazil: 30-40 days | |
Russia: 36 days | |
Japan: 3 days | |
Please advise your port in you inquiry for quoting, will quote for you specifically |
pipe galvanized steel pipe manufacturerspipe galvanized steel pipe manufacturerspipe galvanized steel pipe manufacturers
Contact us
Don't hesitate to contact us if you have any questions. Thank you !
Galvanized Steel Pipe can be made into a strong plumbing or tubing material -- one that resists corrosion from exposure to water or the elements.zinc coated hot galvanized pipe galvanized steel pipe manufacturers has been used used for water-supply pipes or as a strong tubing for outdoor applications.
USHDJ
Galvanized Steel Pipe is most commonly used for outdoor construction like fences and handrails, or for some interior plumbing. zinc coated hot galvanized pipe galvanized steel pipe manufacturers is also sometimes called galvanized iron pipe. Galvanized steel pipe has been coated with a layer of zinc. The zinc provides a barrier against corrosion so that the pipe may be exposed to the outdoor environmental elements.Galvanized Steel Pipe The protective barrier proves equally effective against damage from indoor humidity.zinc coated hot galvanized pipe galvanized steel pipe manufacturers is covered with a zinc material to make the steel pipe more resistant to corrosion.
ASHJHG