Seamless Steel Pipe Hot Rolled API Certification Schedule 40 Carbon Steel Pipe
Size |
OD |
1/2” -24” (13.7mm-609.6mm) |
Wall Thickness |
1.6mm-28mm Class A-1, Class A, Class B, Class C, SCH20,SCH40,STD,XS,SCH80,SCH160,XXS |
|
Length |
5.8M Length, 6M Length or 12M Length or as requested |
|
Steel material |
Q195 → SS330,ST37,ST42 Q235 → SS400,S235JR Q345 → S355JR,SS500,ST52 |
|
Standard |
ASTM A53, BS1387-1985, GB/T3091-2001,GB/T13793-92, GB/T6728-2002 |
|
Zinc Coating: |
120g,270g,400g,500g,550g 20μm ,40μm ,60μm,70μm,80μm |
|
Usage |
1)low pressure liquid, water, gas, oil, line pipe 2)construction 3)fence, door pipe |
|
Ends |
1) Plain 2) Beveled 3) Thread with Coupling or cap 4) Chamfer 5) Groove 6) Screw |
|
End protector |
1) Plastic pipe cap 2) steel socket |
|
Surface Treatment |
1) Bared 2) Black Painted (varnish coating) 3) hot dipped Galvanized, pre-galvanized 4) Oiled 5) PE,3PE, FBE, corrosion resistant coating, Anti corrosion coating. |
|
Technique |
Electronic Resistance Welded (ERW ) Electronic Fusion Welded (EFW) Double Submerged Arc Welded (DSAW) |
|
Welded Line Type |
Longitudinal |
|
Section Shape |
Round |
|
Inspection |
With Hydraulic Testing, Eddy Current , Infrared Test |
|
Port of Shipment |
Xingang Port, Tianjin, China |
|
Date of Delivery |
20 days after confirmation or According To The Quantity And Specification Of Each Order |
Size |
Thickness(mm) | Size | Thickness(mm) | Size | Thickness(mm) |
DN15 1/2" | 1.50 | DN40 1-1/2" | 1.80 | DN100 4" | 2.00 |
1.60 | 2.00 | 2.20 | |||
1.70 | 2.20 | 2.50 | |||
1.80 | 2.50 | 2.75 | |||
2.00 | 2.75 | 3.00 | |||
2.20 | 3.00 | 3.25 | |||
2.50 | 3.25 | 3.50 | |||
2.75 | 3.50 | 3.75 | |||
DN20 3/4" | 1.50 | DN50 2" | 1.80 | 4.00 | |
1.60 | 2.00 | 4.25 | |||
1.70 | 2.20 | DN125 5" | 2.50 | ||
1.80 | 2.50 | 2.75 | |||
2.00 | 2.75 | 3.00 | |||
2.20 | 3.00 | 3.25 | |||
2.50 | 3.25 | 3.50 | |||
2.75 | 3.50 | 3.75 | |||
DN25 1" | 1.50 | DN65 2-1/2" | 2.00 | 4.00 | |
1.60 | 2.20 | 4.25 | |||
1.70 | 2.50 | DN150 6" | 2.50 | ||
1.80 | 2.75 | 2.75 | |||
2.00 | 3.00 | 3.00 | |||
2.20 | 3.25 | 3.25 | |||
2.50 | 3.50 | 3.50 | |||
2.75 | 3.75 | 3.75 | |||
3.00 | DN80 3" | 2.00 | 4.00 | ||
3.25 | 2.20 | 4.25 | |||
DN32 1-1/4" | 1.80 | 2.50 | DN200 8" | 2.75 | |
2.00 | 2.75 | 3.00 | |||
2.20 | 3.00 | 3.25 | |||
2.50 | 3.25 | 3.50 | |||
2.75 | 3.50 | 3.75 | |||
3.00 | 3.75 | 4.00 | |||
3.25 | 4.00 | 4.25 | |||
DN200 | 4.5 | DN200 | 5 | DN200 | 5.75 |
4.75 | 5.5 | 6 |
1. Our company produce various specifications,models as per standards
2. Using high -quality material and advanced production technology and equipment for processing
3. Applicable to a humid climate and the harsh corrosive enviroment
4. Products has been exported to Europe,North American,the Middle East,South East Asia,Africa,Asia,European,other countries and regions
5. We are Seamless Steel Pipe Hot Rolled API Certification Schedule 40 Carbon Steel Pipe Trade-assurance company,Place orders online,get full protection.
♦ Our tenet is Prestinge First, Quality First,Efficiency First and Service First.
♦ All inquires will be replied within 8 hours
♦ High Quality, Reasonable prices, prompt delivery, perfect after-sales services.
♦ Quality Quarantee:
A. All goods strictly inspected during production.
B. All products must be checked strictly before packing.
C. Every consignment must be re-inspected before shipment.
D. You are more than welcomed to my factory to inspect the goods at any time.
♦ Payment made via TT, LC, Western Union or DP.
♦ Shipment:
A. Small and light and valuable goods will be sent by DHL, TNT, UPS, FED by airplane.
B. Large and heavy goods will be shipped by LCL, FCL or bulk vessel.
1. Is your samples free?
Yes, we can provide free samples to my clients.
2. How many days will the samples be finished?
Generally the samples will be sent immediately by the air express in 2~3 days if the goods are in stock.
3. And how about the mass production?
Normally within 20-25 days according to your order.
4. Are you a manufacture?
Yes, we have been in providing the products in this field for 15 years.
5. Is customized availabls?
Yes, we can OEM according to your detailed drawings.
Seamless Steel Pipe mills, volume should go through continuous annealing (CAPL unit) to eliminate cold hardening and rolling stress, or batch annealing reach the Seamless Steel Pipe Hot Rolled API Certification Schedule 40 Carbon Steel Pipe mechanical properties of the corresponding standard specifies. Seamless Steel Pipe surface quality, appearance, dimensional accuracy Seamless Steel Pipe Hot Rolled API Certification Schedule 40 Carbon Steel Pipe better than hot-rolled plate, and right-rolled thin product thickness is about 0.18mm, so the majority of users favor.
DFJBVHJBJH
Seamless Steel Pipe deep processing of high value-added products. Such as electro-galvanized, hot dip galvanized, electro-galvanized fingerprint resistant, painted steel roll damping composite steel, Seamless Steel Pipe Hot Rolled API Certification Schedule 40 Carbon Steel Pipe laminating steel plates, etc, so that the excellent quality of these products has a beautiful, high resistance to corrosion, has been widely used.